Skip To Content
Princeton University Library
Princeton University Library
Digital Collections
    • English
    • Español
    • Português
    • Log in

Something went wrong!

Hang in there while we get back on track

Reports

Meghalaya power policy 2024

2023 - 2024 (approximate)

main image display
Look closer
Similar
Copyright Not Evaluated

Files

12 of 67 images
View all images
image 0
image 1
image 2
image 3
image 4
image 5
image 6
image 7
image 8
image 9
image 10
image 11
Collection
Part of Born Digital Monographic Reports and Papers
Princeton University Library's (PUL) instance of DSpace once served as a digital repository meant for both archiving and publicly disseminating at-risk digital data which was identified and collected by members of the PUL community. In 2025, all items from both categories were migrated to Figgy - PUL's digital repository.
Similar
Copyright Not Evaluated

Metadata

Publisher
Meghalaya : Power Department Government of Meghalaya
Language
English
Geographic Origin
India
Geographic Subject
India
Subject
Environment and ecology
Power resources--Environmental aspects
Science and Technology
Energy development
Socioeconomic conditions and development
Power resources
View all metadata for this item

Share this item

https://digital-collections.princeton.edu/i/meghalaya-power-policy-2024/item/93a613fb-cb75-4c81-a47e-eaaf1b4202a7

Similar Items in this Collection

  • Repowering Wind Farms : maximizing energy yield from existing site lay...

    Date
    2023
    Origin
    India
    60 Files
    Save
  • Carrying capacity and cumulative impact assessment studies for hydroel...

    Date
    2016
    Origin
    India
    513 Files
    Save
  • Decoding state electric vehicle policies : are they designed for scale...

    Date
    2022
    Origin
    India
    88 Files
    Save
  • Pakistan’s off-shore wind energy potential : social, economic and fina...

    Date
    2024
    Origin
    Pakistan
    49 Files
    Save
  • Socio-environmental de-risking instruments for Solar power in India

    Date
    2021
    Origin
    Bangladesh
    28 Files
    Save

Similar Items outside this Collection

  • Turning challenges into opportunities

    Date
    2010
    Origin
    India
    6 Files
    Save
  • Dirty talking? Case for telecom to shift from diesel to renewable

    Date
    2011
    Origin
    India
    25 Files
    Save
  • 510 mw Teesta stage- V power station, Sikkim

    Date
    2008
    Origin
    India
    5 Files
    Save
  • Making water available in the salinity affected villages of coastal Ju...

    Date
    2005
    Origin
    India
    9 Files
    Save
  • Water for a better life: people's movement for regeneration

    Date
    2001
    Origin
    India
    19 Files
    Save

Suggest a correction

Please use this area to report errors, omissions, or problematic language that appear in the description of this collection. Corrections may include misspellings, incorrect or missing dates, misidentified individuals, places, or events, mislabeled folders, misfiled papers, etc.

Sorry, something went wrong. Either the message was blank or there was an error with the form submission. Please try again or email the library directly.

Viewer

Share this image

https://digital-collections.princeton.edu/i/meghalaya-power-policy-2024/item/93a613fb-cb75-4c81-a47e-eaaf1b4202a7/viewer/2

  • Copyright Policy
  • Privacy Notice
  • Accessibility Help
© 2025 The Trustees of Princeton University
Princeton University